Výrobný program a služby
 

Případové studie

Growing in the right direction at Dillions Vineyard

A new vineyard planted in West Sussex has had Hadley Group’s UltraSTEEL® vineposts installed across its fields, thanks to its unique combination of durability and performance, which will ensure a long working life.

CPřečíst si

Rathfinny Estate Toasts To Hadley Group Success

When Rathfinny Estate needed to upgrade its existing vinepost collection, the Sussex-based winery turned to Hadley Group for help. In doing so, they joined a long list of wine growers to have had the company’s industry-leading units installed across its fields.

CPřečíst si

New machine adds significant capacity to Hadley Group’s capabilities in the steel framing market

Following the acquisition of Hadley Steel Framing (HSF) in 2018, Hadley Group has further strengthened its position and improved its capabilities in the steel framing market by investing in a new purpose-built machine at its Oldbury production site.

CPřečíst si

Hadley Group's Steel Framing Structure offers lightweight and efficient solution for Coventry Modular Housing Project

Hadley Group’s rollformed light gauge structural framing systems have recently been incorporated in the design and build of two pre-fabricated homes. Constructed by Totally Modular in their Cradley Heath factory, the houses were then transported more than 30 miles away to the WM Housing Group development in Littlethorpe, Willenhall.

CPřečíst si

HADLEY GROUP PROVIDES A ROOFTRUSS OVER NEW THAILAND SCHOOL

Manufactured using the UltraSTEEL® process and further enhanced with the company’s UltraBOSS™ technology, the strong and non-combustible nature of Hadley Group’s RoofTruss system has helped to complete a large educational project in Rayong, Thailand.

CPřečíst si

Light Gauge Steel Profiles: Problem-solving at its best with The Depot

Part of the international Hadley Group, Hadley Steel Framing’s light gauge steel profiles have been installed in a nine-storey student accommodation in Exeter, called The Depot. The £40m development will provide accommodation for circa 600 students.

CPřečíst si

SCRAP CONVEYOR UPGRADE

The scrap conveyors originally employed on the pre-pierce presses in Rollforming Division had several functional flaws, which caused inefficiencies in production as well as high maintenance costs. Upgrading to a new generation of conveyors addressed these issues, delivering greater operational efficiency.

CPřečíst si

Ultra Facilities Services delivers 25% cost savings for EWS Manufacturing

When Hadley Group acquired EWS Manufacturing they set out to improve its facilities services by turning to its own facilities management partner, Ultra Facilities Services, for assistance. The turnaround of services will now deliver a 25 per cent cost saving over a 12-month period.

CPřečíst si